Lift Shaft Facias Completed
Posted 22 December 2022
The view up the shaft looks great when the items are all in alignment! this job consisted of a visit to measure for shaft facia panels to suit the gaps at each floor, then manufacture and fit to allow the lift to be handed over fully compliant.
follow the link to read more on our linkedin page
OTHER POSTS
Larger Architraves on the Doorstep!
15 November 2022
Lift Shaft Facias Completed
22 December 2022
An Arc made for 2 by 2!
9 November 2022
New Vehicles for the Fleet!
9 November 2022
New handrails for a car refurb
9 November 2022